Measure UDixon Unified School DistrictBond

Measure U: Measure U – Dixon Unified School District – Bond Measure

Dixon Unified School District · Solano County · November 3, 2026

The question on your ballot

“To fix deteriorating roofs, plumbing, gas, and electrical systems, remove asbestos/lead pipes, repair/upgrade aging classrooms, science labs, technology and school facilities to support college/ career readiness in math, science, technology, arts, engineering, and skilled trades; shall Dixon Unified School District’s measure authorizing $49,000,000 in bonds at legal rates be adopted, levying approximately $30 per $100,000 assessed value ($3,000,000 annually) while bonds are outstanding, with citizen oversight, independent audits, and all money locally controlled?”

In plain language

Measure U is a school bond for Dixon schools. A YES vote lets the district borrow $49,000,000. The money would fix worn roofs and plumbing. It would fix gas and electrical systems too. It would remove asbestos and lead pipes. It would update aging classrooms and science labs. Tech buildings would get upgrades too. A NO vote blocks this borrowing for these projects. The measure requires citizen oversight and outside audits.

Fiscal impact

The bond is repaid with a property tax of about $30 per $100,000 of assessed value. It would raise about $3,000,000 each year while the bonds are owed.

Impartial analysis

IMPARTIAL ANALYSIS OF MEASURE U DIXON UNIFIED SCHOOL DISTRICT GENERAL OBLIGATION BOND MEASURE Measure U was placed on the ballot by the Governing Board of the Dixon Unified School District. If approved, Measure U would authorize the District to issue and sell general obligation bonds in an aggregate principal amount not to exceed $49,000,000, at interest rates within legal limits. Bond proceeds would be used for school facility projects identified in the measure, including constructing and renovating classrooms and other school facilities; replacing deteriorating portable classrooms; repairing or replacing roofs, plumbing, sewer and gas lines, heating, ventilation, air-conditioning and electrical systems; making health, safety and seismic improvements; improving technology infrastructure; and constructing or renovating libraries, multipurpose rooms, cafeterias, athletic facilities, playgrounds and other school facilities. The District would determine the priority and timing of projects, and approval of the measure does not guarantee that all listed projects will be completed. The measure includes accountability requirements governing the use of bond proceeds. Bond proceeds may be used only for the purposes specified in the measure and may not be used for teacher or administrator salaries or other school operating expenses. The measure requires an independent citizens’ oversight committee, annual independent performance and financial audits, and annual reports regarding the receipt and expenditure of bond proceeds and the status of funded projects. Principal and interest on the bonds would be paid by property taxes levied on taxable property within the District. According to the District’s Tax Rate Statement, the estimated average annual tax rate is $29 per $100,000 of assessed valuation, and the estimated highest tax rate is $30 per $100,000 of assessed valuation. The District estimates that taxes will be collected through fiscal year 2061-62 and that total debt service, including principal and interest, will be approximately $105,000,000. These amounts are estimates and may vary. A “yes” vote on Measure U means general obligation bonds totaling up to $49,000,000 may be issued to finance the school facility projects specified in the measure. A “no” vote on Measure U means the bonds will not be authorized. Measure U requires approval by at least 55 percent of the votes cast on the measure to pass. Respectfully submitted, Carrie Blacklock Solano County Counsel

Official ballot arguments

Filed for the official voter guide by each side, printed as submitted.

What supporters and opponents say — outside sources (not official ballot arguments)

Statements by campaigns, officials and news coverage, quoted with attribution and linked to the original. VoterDecoder did not write them and does not endorse either side.

Supporters say

No public statements in favor were found.

Opponents say

No public statements against were found.

The issue, explainedEducation →
See everything on your ballot — enter your address →

Official text from the elections office; outside statements are quoted with attribution. Confirm your official ballot with your county elections office. We never tell you how to vote.