Measure SOS
City of South Pasadena · Los Angeles County · November 3, 2026
The question on your ballot
SOUTH PASADENA STREET/ROAD/POTHOLE REPAIR, 9-1-1 SAFETY MEASURE. To fix damaged local streets/roads/sidewalks, repair potholes, address speeding/unsafe driving; improve emergency evacuation routes; upgrade/repair storm drains to prevent flooding, prevent cuts to City services; shall the City of South Pasadena measure authorizing $80,000,000 in bonds at legal rates, levying on average $33 per $100,000 of assessed valuation, generating approximately $4 ,400,000 annually while bonds are outstanding be adopted, requiring public spending disclosure, audits, all funds spent locally?
In plain language
A VoterDecoder summary of the official measure text.
South Pasadena asks to borrow up to $80,000,000 by selling bonds, which are loans the city repays with interest from a property tax. The money would go to street, road and sidewalk repairs, evacuation routes and storm drains.
The city estimates the tax would average $32.33 per $100,000 of assessed value, which is the value the county sets on a property for tax purposes. It would raise about $4,400,000 a year, and the last collection would be in fiscal year 2062-2063. The actual rate will vary with bond sales and interest rates. The money goes into a separate account, and the city's chief financial officer must report publicly each year on how it is spent. Approval takes two-thirds of the vote.
A YES vote means South Pasadena may issue up to $80,000,000 in bonds for street, road, sidewalk, evacuation route and storm drain work, repaid by a property tax averaging $32.33 per $100,000 of assessed value through fiscal year 2062-2063.
A NO vote means South Pasadena may not issue these bonds, and this property tax is not levied.
Fiscal impact
The measure allows $80,000,000 in bonds. It would be repaid by a tax averaging $33 per $100,000 of assessed value, which would raise about $4,400,000 a year while the bonds last.
Impartial analysis
Written for the official voter guide by the county counsel or city attorney.
City Attorney’s Impartial Analysis of Measure SOS
If adopted by the voters, Measure SOS would authorize the City of South Pasadena to issue general obligation bonds to finance the acquisition, construction, completion, improvement, reconstruction, rehabilitation or replacement of the City’s streets, roads and sidewalks, including curbs, gutters and parkways, evacuation routes and storm drains (together, the “Improvements”). Measure SOS was placed on the ballot by the South Pasadena City Council.
General obligation bonds are a common way cities can finance public improvements and are authorized by the California Constitution and Government Code. Measure SOS limits the principal amount of the bonds to no more than $80,000,000. Principal and interest payments for the bonds, commonly known as debt service, will be paid solely from the revenues produced by a tax on real property in the City, authorized by Measure SOS.
The City’s published Tax Rate Statement estimates that the property taxes levied to pay the debt service would be at an average tax rate of $0.03233 per $100 (or $32.33 per $100,000) of the assessed value of property taxed. The actual tax rate will vary over the term of the repayment of the bonds based on factors such as the timing of bond sales, the amount of bonds sold, market interest rates at the time of each sale and the assessed valuation of the property . The actual interest rates at which the bonds will be sold are set by the bond market at the time of each sale. The City proposes to issue one or more series of general obligation bonds over time.
The City estimates the tax would generate $4,400,000 annually to pay the bond principal and interest. The final fiscal year the tax will be collected is 2062-2063.
Measure SOS contains accountability requirements, including that bond proceeds must be deposited in a separate account to be spent solely for the Improvements set forth in Ordinance No. 2416, and not for any other purpose. In addition, the City’s Chief Financial Officer must file a public report with the City Council at least annually showing the amount of the bond proceeds collected and spent, and the status of the I mprovements. The final costs, locations, designs, layouts and other components of the Improvements will be determined as plans are finalized, construction bids are awarded, and projects are completed.
In order to pass, Measure SOS must be approved by two-thirds of the voters.
A “yes” vote on Measure SOS authorizes the City to issue general obligation bonds for the acquisition, construction, completion, improvement, reconstruction, rehabilitation or replacement of the City’s streets, roads and sidewalks, including curbs, gutters and parkways, evacuation routes and storm drains.
A “no” vote on Measure SOS is against the issuance of such bonds.
The above statem ent is an impartial analysis of Measure SOS. If you desire a copy of Measure SOS, please call the City Clerk’s office at [phone number omitted] or [phone number omitted] and a copy will be mailed at no cost to you.
Roxanne M. Diaz, City Attorney City of South Pasadena
Arguments for and against
Only one side filed an official argument for the voter guide. It is printed as submitted; the other side is a summary written by VoterDecoder.
Argument in favor
Vote YES on Measure SOS — Save Our Streets!
We all know this simple truth: Delaying maintenance makes repairs more expensive.
The same is true for South Pasadena's 69 miles of deteriorating streets. They need our help now before repairs become more expensive.
Today, independent engineers rate over 63% of South Pasadena’s streets as “Fair,” “Poor,” or “Very Poor.”
Most local streets were constructed 70-100 years ago and the street base, drainage systems, and curbs date back decades.
A street that can be properly maintained today for approximately $50,000 per mile may cost $1,000,000 per mile or more if repairs are delayed — and up to $2,500,000 per mile if deterioration requires complete reconstruction.
That's why Measure SOS focuses on repairing streets before they fail. Every $1 invested in maintenance can avoid $6-$10 in future reconstruction. The right repair at the right time saves us millions.
Measure SOS is a smart investment plan to protect South Pasadena’s streets by:
• Repairing or replacing deteriorating neighborhood streets • Replacing aging storm drain infrastructure that prevents flooding • Improving safety for drivers, bicyclists, pedestrians, and students
Measure SOS implements a detailed pavement management plan with projects prioritized using independent engineering assessments, so repairs are made where they’re needed most before reconstruction becomes far more expensive. Where needed, street reconstruction will be aligned with underground storm drain replacement for efficiency.
Measure SOS protects taxpayers by ensuring all funds:
• Stay in South Pasadena • Are spent only on street improvement plans developed by experts • Remain legally protected from being taken by the county, state, or federal governments • Are independently audited and disclosed to the public
South Pasadena is a wonderful place to live, and Measure SOS is a smart investment that fixes the streets that keep our community safe and connected.
Vote Yes on SOS to Save Our Streets!
Janet Braun, City Councilmember Michele Kipke, President, South Pasadena Unified School District Board of Education Bob Joe, Former Mayor Shireen Chang, Past President, South Pasadena Chinese-American Club; VP Senior Citizens Foundation of South Pasadena Kris Maines, President, The Oneota Club
Argument against
No official argument against was submitted.
A NO vote would mean South Pasadena does not issue the $80,000,000 in bonds, and the property tax that would repay them would not be collected. The City Attorney's analysis says the bonds would be paid back solely from a tax on real property in the city, so property owners would carry the cost. Voters who do not want a new property tax could vote NO for that reason. The tax is estimated to average $32.33 per $100,000 of assessed value, and the ballot question says about $33 per $100,000. It would raise about $4,400,000 a year, and the last year it would be collected is 2062-2063. Voters who are concerned about how long the tax would last could vote NO. The principal and interest payments, called debt service, would come only from this tax. The analysis also says the actual tax rate would vary over time. It would depend on when bonds are sold, how much is sold, interest rates at each sale, and assessed property values. The city proposes to issue one or more series of bonds over time, and the bond market sets the actual interest rates at the time of each sale. Voters who want more certainty about the final cost could vote NO. The analysis adds that the final costs, locations and designs of the projects would be decided later, as plans are finished and construction bids are awarded. Measure SOS needs two-thirds of the vote to pass. The analysis says the bond money would go to streets, roads, sidewalks, curbs, gutters, parkways, evacuation routes and storm drains. A NO vote would mean none of the $80,000,000 would be raised for those projects through this measure.
What supporters and opponents say — outside sources (not official ballot arguments)
Statements by campaigns, officials and news coverage, quoted with attribution and linked to the original. VoterDecoder did not write them and does not endorse either side.
Supporters say
“The right repair at the right time will save South Pasadena millions”
— Dean Serwin, campaign co-chair, South Pasadena Review (Outlook Newspapers) (2026) · Committee launches measure aimed at street repairRead the source →
Opponents say
No public statements against were found.